Project Summary
- Calgary, AB
- Completed 2015
What Mattered to the Client
Resilience, connectivity, and a structure that reflects the identity of Stampede Park while addressing long-term environmental realities.
Following the 2013 flood, the Calgary Stampede required a new crossing that would restore critical site access while improving durability and flood resistance. The project needed to withstand extreme river conditions, maintain safe and efficient movement for both pedestrians and service vehicles, and align with the cultural character of the Stampede.
Beyond functionality, the crossing was an opportunity to reinforce the western heritage of the site. The design had to integrate practical engineering with architectural expression, ensuring the structure contributed to the overall experience of Stampede Park.
What we Built Together
A purpose-built bridge crossing designed for durability, accessibility, and integration with the surrounding environment.
Weadick Crossing replaced a previous structure lost during flooding, introducing a more resilient and flood-conscious design. The bridge accommodates pedestrian movement and operational access, while incorporating structural features that allow for safe passage, including considerations for equestrian use.
The design integrates structural efficiency with contextual detailing, reflecting the western identity of the Stampede while ensuring long-term performance. Environmental considerations were embedded into the approach, with a focus on minimizing impact and improving flood mitigation capacity.
Our Role
Lawson Projects acted as Project Manager, supporting the Calgary Stampede and project team through planning, coordination, and construction delivery.
Our role focused on aligning stakeholders, managing project execution, and maintaining momentum through a technically and logistically complex build. Coordination across multiple consultants, contractors, and regulatory requirements was essential to ensure timely delivery and long-term performance.
We provided oversight throughout construction, supporting decision-making, risk management, and ensuring the project met both functional and design objectives.
The Result
A resilient and functional crossing that restores critical connectivity within Stampede Park while enhancing the overall site experience.
Weadick Crossing provides reliable access across the Elbow River, designed to withstand future environmental challenges while reflecting the character of the Stampede. The project demonstrates how infrastructure can serve both practical needs and contribute to a broader sense of place within a major civic destination.
See more




