TransAlta Performing Arts Studios

Project Summary

  • Calgary Stampede, AB

  • Completed 2017

What Mattered to the Client

Flexibility, performance readiness, and creating a purpose-built environment where artists can train, rehearse, and collaborate at all levels. 

As part of the broader Youth Campus vision, the TransAlta Performing Arts Studios needed to support a wide range of users—from individual performers to large ensembles—within a single, cohesive facility. The space had to accommodate music, dance, and performance training, while remaining adaptable for workshops, education, and community use. 

Equally important was delivering a facility that was ready to use at any moment. Fully equipped, technically capable spaces were essential to allow users to focus on performance rather than setup or logistics. 

What was Delivered

A purpose-built performing arts facility designed for rehearsal, training, and creative development across multiple disciplines. 

The TransAlta Performing Arts Studios provide over 10,000 square feet of flexible indoor space, with capacity to support up to 800 users across a range of studio environments.  

The facility includes a variety of specialized studios, from large-scale rehearsal spaces capable of accommodating up to 150 performers, to smaller rooms designed for private lessons and focused training.  

Spaces are tailored to specific uses, including dance studios with sprung floors and mirrors, music rehearsal rooms with integrated acoustic and technical systems, and multipurpose studios that support workshops, meetings, and performances.  

Supporting amenities include artist lounges, green rooms, change facilities, and meeting spaces, creating a complete environment for both preparation and performance. These spaces are designed to enhance the user experience, offering areas for collaboration, rest, and transition between activities. 

 

Our Role

Lawson Projects acted as Owner’s Representative Project Manager, supporting the Calgary Stampede through planning, design coordination, procurement, and construction. 

Our role focused on aligning the diverse functional requirements of a multi-use performing arts facility within a clear and deliverable framework. Coordination across user groups, consultants, and technical requirements was critical to ensure each space met its intended purpose. 

We maintained oversight of budget, schedule, and design development, ensuring that the final facility delivered both technical performance and operational flexibility. 

The Result

A highly adaptable performing arts facility that supports training, rehearsal, and creative development within Calgary’s Youth Campus. 

The TransAlta Performing Arts Studios provide a fully equipped, ready-to-use environment for artists at all levels. Designed for flexibility and long-term use, the facility enables a wide range of programming while supporting the continued growth of Calgary’s performing arts community. 

REFERENCES

Client – Jim Bellingham – Capital Projects Construction Manager, Calgary Stampede, (403)261-0158

Design – Robert Spaetgens – Principal, S2 Architecture (403)670-7000

What they said

“Lawson Projects was the thread that held this project together through multiple leadership changes. Their record keeping saved us countless hours, and their proactive approach caught things we never would’ve seen coming. They didn’t just manage—they owned it.”