Project Summary
- Calgary, AB
- Completed 2000
What Mattered to the Client
Continuity of care, patient safety, and delivering a complex healthcare project without disrupting ongoing operations.
The Alberta Cancer Board required a significant expansion and renovation of the Tom Baker Cancer Centre within the Foothills Hospital campus. The project needed to increase capacity and modernize existing spaces while maintaining full operation of critical healthcare services throughout construction.
Strict infection prevention and containment protocols were essential. Work had to be carefully phased and executed within an active clinical environment, ensuring the safety of patients, staff, and visitors at all times.
At the same time, the project was guided by defined budget parameters and a fixed delivery schedule, requiring disciplined coordination across multiple stakeholders.
What we Built Together
A major facility expansion combined with a phased renovation of existing clinical and support spaces.
The project included a new 70,000 sq. ft., three-level expansion to the existing Tom Baker Cancer Centre, followed by the renovation of an additional 70,000 sq. ft. across the original facility and adjoining areas within the Special Services Building.
Work was delivered in carefully sequenced phases to maintain continuous operation of the centre. Infection control measures were integrated into all aspects of construction planning and execution, ensuring safe separation between active healthcare environments and construction activities.
The result is an upgraded and expanded facility that improves functionality, supports evolving care needs, and enhances the overall environment for patients and staff.
Our Role
Lawson Projects acted as Project Manager, working within a joint governance structure that included the Alberta Cancer Board, Calgary Health Region, and Alberta Infrastructure.
Our role required coordination across multiple decision-making bodies, ensuring alignment between user group requirements, design development, and project delivery. We supported the development of working drawings within approved budget guidelines while maintaining focus on quality, cost, and schedule.
Throughout construction, we managed phased implementation, stakeholder communication, and strict adherence to healthcare construction protocols.
The Result
A complex healthcare project delivered within an active hospital environment, meeting both budget and schedule requirements.
The Tom Baker Cancer Centre expansion and renovation enhances the facility’s ability to provide critical cancer care while maintaining uninterrupted service throughout construction. The project reflects a coordinated, disciplined approach to delivering healthcare infrastructure where safety, precision, and continuity are essential.
See more



