Smucker’s Distribution Centre

Project Summary

  • Balzac, AB

  • Completed 2021

What Mattered to the Client

Efficiency, scalability, and delivering a modern distribution facility capable of supporting high-volume operations within Western Canada’s growing logistics network. 

Located within High Plains Industrial Park, the Smucker’s Distribution Centre needed to support the movement of goods at scale while meeting strict food-grade operational requirements. The facility was designed to provide long-term flexibility, operational durability, and efficient transportation access within one of the region’s key industrial corridors. 

Balancing functionality, speed of delivery, and future growth potential was central to the project’s success.

What was Delivered

A large-scale industrial cross-dock distribution facility designed for efficient logistics operations and long-term adaptability. 

Constructed on a 29.6-acre site, the facility includes 148 loading bays and four drive-in grade doors, supporting high-volume shipping and receiving operations. Extensive site infrastructure, including asphalt paving, concrete dock aprons, and trailer parking with dolly pads, was incorporated to facilitate efficient truck movement and day-to-day logistics operations. 

The building combines conventional structural steel, precast concrete elements, metal panel systems, and EPDM roofing to create a durable and cost-effective industrial facility designed for long-term performance. 

Special consideration was given to food-grade operational requirements throughout the design and construction process, ensuring the facility could support Smucker’s distribution standards and operational needs. 

The development also includes future expansion capability, with the potential to accommodate up to 50,000 sq. ft. of additional office space as operations evolve. 

 

Our Role

Lawson Projects acted as Project Manager, supporting the project through planning, coordination, procurement, and construction delivery. 

Our role focused on maintaining alignment between operational requirements, construction execution, and schedule performance within a fast-paced industrial development environment. Coordination across consultants, contractors, and stakeholders was essential to ensure the facility met both logistical and technical requirements. 

Working within the broader High Plains Industrial Park development, the project required careful integration with surrounding infrastructure and ongoing site servicing initiatives.

The Result

A modern distribution facility positioned to support Smucker’s operations across Western Canada. 

The Smucker’s Distribution Centre delivers the scale, functionality, and flexibility required for large-scale logistics operations while contributing to the continued growth of High Plains Industrial Park as a major industrial and distribution hub.

REFERENCES

Client – Jim Bellingham – Capital Projects Construction Manager, Calgary Stampede, (403)261-0158

Design – Robert Spaetgens – Principal, S2 Architecture (403)670-7000

What they said

“Lawson Projects was the thread that held this project together through multiple leadership changes. Their record keeping saved us countless hours, and their proactive approach caught things we never would’ve seen coming. They didn’t just manage—they owned it.”

See more