Mustard Seed

Project Summary

  • Calgary, AB | Completed 2009

  • 224 Units

What Mattered to the Client

Long-term impact, stability, and a solution that moves beyond emergency shelter toward permanent, affordable housing. 

The Mustard Seed Street Ministry identified a critical gap in the housing continuum. While emergency services address immediate needs, they do not provide the stability required for long-term change. This project was driven by a need to create safe, accessible housing in a central location, supporting individuals as they transition toward independence. 

Located at 10th Avenue and Centre Street South, the site presented an opportunity to deliver meaningful impact within Calgary’s downtown core. The project required balancing density, livability, and integration with support services, ensuring residents have access to both housing and the resources needed to succeed.

What we Built Together

A purpose-built affordable housing development designed to support long-term residency and community integration. 

The project includes demolition of an existing two-storey structure and the construction of a 22-storey tower featuring approximately 224 studio and one-bedroom units. The building incorporates underground parking, street-level amenities, and dedicated office space for The Mustard Seed’s programs and partner agencies. 

The design supports both residential and programmatic needs, creating a cohesive environment where housing and support services are integrated. Careful consideration was given to building functionality, resident experience, and the efficient use of space within a high-density urban setting. 

 

Our Role

Lawson Projects acted as Project Manager, supporting The Mustard Seed and the consultant team from early planning through to project completion. 

Our role included oversight of budgeting, value engineering, and schedule analysis, ensuring alignment between project scope, funding realities, and delivery timelines. We guided the project through the permitting process, coordinated specialist consultants, and maintained continuity across all phases of development. 

During construction, Lawson Projects led tendering and contractor selection strategies, followed by full construction management and contract administration. Throughout, the focus remained on proactive coordination, clear communication, and disciplined project delivery.

The Result

A significant addition to Calgary’s affordable housing inventory, delivering stable, long-term housing in a central and accessible location. 

The Mustard Seed Affordable Housing Project represents a shift from short-term response to long-term solution, providing residents with not only a place to live, but access to the support systems needed to build stability and move forward. 

See more