Gordon Foods Distribution Centre

Project Summary

  • Balzac, AB

  • Completed 2015

What Mattered to the Client

Operational efficiency, temperature-controlled performance, and a facility designed to support long-term growth. 

Gordon Food Service required a modern distribution centre capable of supporting complex cold-chain logistics while maintaining operational reliability and efficiency. The facility needed to accommodate a wide range of storage and processing environments, from freezer and cooler spaces to food processing and ambient warehousing. 

Long-term scalability was also a key consideration. The development needed to support future expansion while maintaining uninterrupted operations and efficient building performance from day one. 

What was Delivered

A large-scale distribution facility designed to support refrigerated food logistics and future operational growth. 

The approximately 290,000 sq. ft. facility includes 142,000 sq. ft. of freezer, cooler, and cold dock areas, 14,750 sq. ft. of cold food processing space, 92,000 sq. ft. of ambient storage, and more than 41,000 sq. ft. of office and equipment areas. 

Construction included pile foundations, grade beams, structural steel framing, and EPDM roofing systems. A range of insulated metal panel assemblies was utilized throughout the building envelope to achieve the varying thermal performance requirements associated with multiple temperature-controlled environments. 

Special attention was given to water management and environmental performance. The facility incorporates interceptors and a fat, oil, and grease pre-treatment system for processing areas, along with water recycling systems serving both truck wash operations and refrigeration equipment. These systems reduced overall water demand while supporting compliance with municipal requirements and improving long-term operational efficiency. 

The facility was also designed to accommodate two future expansions, allowing the building to grow to approximately 500,000 sq. ft. as operational needs evolve.

 

Our Role

Lawson Projects acted as Project Manager, supporting the project through planning, coordination, procurement, and construction delivery. 

Our role focused on aligning operational requirements with technical building systems, construction sequencing, and long-term expansion planning. Coordination between consultants, contractors, and stakeholders was critical given the complexity of the temperature-controlled environments and specialized servicing requirements. 

Working within the broader High Plains Industrial Park development, the project also required integration with site infrastructure and ongoing industrial servicing initiatives.

The Result

A modern cold-chain distribution facility designed to support efficient food logistics operations across Western Canada. 

The Gordon Food Service Calgary Distribution Centre combines operational functionality, environmental performance, and future scalability within a highly specialized industrial environment. The project strengthens the region’s logistics infrastructure while positioning the facility for continued long-term growth. 

REFERENCES

Client – Jim Bellingham – Capital Projects Construction Manager, Calgary Stampede, (403)261-0158

Design – Robert Spaetgens – Principal, S2 Architecture (403)670-7000

What they said

“Lawson Projects was the thread that held this project together through multiple leadership changes. Their record keeping saved us countless hours, and their proactive approach caught things we never would’ve seen coming. They didn’t just manage—they owned it.”