Calgary Stampede: Youth Campus Phase 1

Project Summary

  • Calgary Stampede, AB

  • Completed 2018

What Mattered to the Client

Community impact, youth development, and creating a space where education and the performing arts can thrive together. 

The Calgary Stampede envisioned the Youth Campus as more than a facility. It needed to be a destination where young people could develop their talents, build confidence, and connect with the community through creative expression. 

Located along the Elbow River, the site required thoughtful integration with its surroundings while supporting a wide range of indoor and outdoor programming. The program needed to accommodate performance, training, and education, all within a flexible environment designed to evolve over time.

What was Delivered

A purpose-built creative campus designed to support learning, performance, and community engagement. 

The Youth Campus includes a collection of spaces tailored to artistic development, including the BMO Amphitheatre, Doherty Hall, TransAlta Performing Arts Studios, and the Calgary Arts Academy. The approximately 13,000 sq. ft. facility is complemented by outdoor areas that enable expanded programming and connection to the surrounding landscape. 

Designed as a multi-use environment, the campus supports a range of users, including the Young Canadians School of the Performing Arts, the Calgary Stampede Showband, and other community groups. The layout encourages collaboration, flexibility, and year-round use across disciplines. 

Planned future components, including the SAM Centre, Enbridge Plaza, and partnerships with organizations such as Calgary Opera, position the campus for continued growth and long-term relevance.

 

Our Role

Lawson Projects acted as Owner’s Representative Project Manager, supporting the Calgary Stampede through planning, design coordination, procurement, and construction. 

Working closely with the client and stakeholders, our role focused on aligning diverse program requirements within a cohesive vision. Coordination across multiple user groups, consultants, and project phases was critical to ensure the campus met both immediate needs and future expansion goals. 

Our approach emphasized clear communication, disciplined project controls, and maintaining alignment between design intent, budget, and schedule throughout delivery. 

The Result

A dynamic, purpose-built campus that supports the next generation of performers, creators, and community leaders. 

The Calgary Stampede Youth Campus provides a platform for education, performance, and collaboration, strengthening Calgary’s cultural landscape. Designed for flexibility and growth, the campus brings together arts, learning, and community in a setting that will continue to evolve and inspire for years to come.

REFERENCES

Client – Jim Bellingham – Capital Projects Construction Manager, Calgary Stampede, (403)261-0158

Design – Robert Spaetgens – Principal, S2 Architecture (403)670-7000

What they said

“Lawson Projects was the thread that held this project together through multiple leadership changes. Their record keeping saved us countless hours, and their proactive approach caught things we never would’ve seen coming. They didn’t just manage—they owned it.”

See more