City of Calgary Hazardous Household Waste Transfer Station

Project Summary

  • Calgary, AB | Completed 2024
  • 28,000 square feet

What Mattered to the City

Safety, efficiency, and longevity.

Flexibility and safety were critical. Hazardous waste management continues to evolve and the previous facility had reached the end of its 30-year lifespan. The new facility needed to safely handle a wide range of materials including paints, flammables, toxics, corrosives while remaining adaptable to future changes in waste streams and regulations.

The City’s Waste and Recycling Services team required a durable, long-term solution that met stringent regulatory requirements and supported safe, efficient operations. Delivering the project also meant navigating complex codes related to dangerous goods and maintaining progress through a challenging supply chain environment.

What was Delivered

The project team delivered a purpose-built hazardous waste transfer facility designed for safe handling, sorting and storage of a wide range of materials.

The facility includes a receiving area, sorting space and multiple storage zones for different chemical classes, along with administrative areas including offices, meeting rooms, locker rooms and staff amenities. It accommodates materials ranging from latex paint to Transportation of Dangerous Goods Classes 2 through 9, with systems in place to safely manage unknown substances.

The design evolved alongside the program. During the project, changes to the Alberta HHW program reduced the need for certain storage and processing functions. The team adjusted the layout to reflect current needs while maintaining flexibility for future expansion.

Specialized building systems were integrated to meet the requirements of hazardous materials handling. These included hazardous location-rated mechanical and electrical systems, chemical-resistant materials and ventilation and fire protection systems designed to comply with applicable codes and the Environmental Protection and Enhancement Act.

Despite supply chain challenges affecting key components, the project team maintained progress and continuity through proactive coordination and planning.

Our Role

Lawson Projects staff were embedded within the City of Calgary project team, supporting project management, coordination and delivery.

Working as part of the City’s team, our role focused on maintaining alignment across partners, supporting coordination between user groups, consultants, contractors and helping advance the project through procurement, design and construction.

The Result

A modern hazardous household waste facility that safely manages a wide range of materials, adapts to evolving program requirements and is designed for long-term service beyond 30 years.

Delivered under budget and positioned to support the City’s waste management needs well into the future.

What they said

“Lawson Projects was the thread that held this project together through multiple leadership changes. Their record keeping saved us countless hours, and their proactive approach caught things we never would’ve seen coming. They didn’t just manage—they owned it.”