Projects

  • Shawnessy Lodge Addition

    Project Summary Calgary, AB | Completed 2011 755 m² addition | 15 new units What Mattered to Silvera Expanding care without losing what made Shawnessy Lodge feel like home. Shawnessy Lodge had been serving seniors since 1992 and had become one of Silvera’s most popular locations. With demand for specialized care growing, Silvera needed additional…

  • Mustard Seed

    Project Summary Calgary, AB | Completed 2009 224 Units What Mattered to the Client Long-term impact, stability, and a solution that moves beyond emergency shelter toward permanent, affordable housing.  The Mustard Seed Street Ministry identified a critical gap in the housing continuum. While emergency services address immediate needs, they do not provide the stability required…

  • WIllow Park on the Bow Residence

    Project Summary Calgary, AB | Completed 2010 150 Units What Mattered to the Client Accessibility, affordability, and a comfortable living environment that supports independence for seniors.  The vision for Willow Park on the Bow was to create a well-appointed residential community that balances quality living with attainable rental rates. Located in Bridgeland, the project needed…

  • Calgary Affordable Housing Unit

    Project Summary Calgary, AB | 2026 60 Units + Community Space What Mattered to the Client A non-profit, Indigenous-led housing provider serving urban Indigenous families in Calgary needed to turn secured land into an approved, buildable development. The land had been acquired through the City of Calgary’s non-market land sale process, with funding drawn from…

  • Okotoks Affordable Housing Unit

    Project Summary Okotoks, AB | Completed 2026 10 Units | 10,700 square feet What Mattered to the Client A safe, well-located rental option in a town where vacancy has hovered near zero. Our client, a non-profit housing provider, worked with the local municipality to bring genuinely affordable rental housing to the community, on municipally supported…

  • Livingston Hub Firehall #44

    Project Summary Calgary, AB Completed 2021 What Mattered to the City Safety, community integration, and creating a civic facility that supports both functionality and identity within a growing neighbourhood.  Livingston Hub was envisioned as more than a fire station. The project needed to serve as a central community asset, combining emergency response infrastructure with a design…

  • FortisAlberta: Provincial Facilities Program

    Project Summary Multiple Locations, AB Completed in the span of a decade. What Mattered to the Client Reliability, scalability, and facilities that support 24/7 utility operations across a geographically diverse network.  FortisAlberta required a coordinated approach to developing and upgrading facilities that support field operations, administration, and critical infrastructure. Each project needed to align with operational…

  • Gordon Foods Distribution Centre

    Project Summary Balzac, AB Completed 2015 What Mattered to the Client Operational efficiency, temperature-controlled performance, and a facility designed to support long-term growth.  Gordon Food Service required a modern distribution centre capable of supporting complex cold-chain logistics while maintaining operational reliability and efficiency. The facility needed to accommodate a wide range of storage and processing environments, from freezer and cooler spaces…

  • Smucker’s Distribution Centre

    Project Summary Balzac, AB Completed 2021 What Mattered to the Client Efficiency, scalability, and delivering a modern distribution facility capable of supporting high-volume operations within Western Canada’s growing logistics network.  Located within High Plains Industrial Park, the Smucker’s Distribution Centre needed to support the movement of goods at scale while meeting strict food-grade operational requirements. The facility…

  • TransAlta Performing Arts Studios

    Project Summary Calgary Stampede, AB Completed 2017 What Mattered to the Client Flexibility, performance readiness, and creating a purpose-built environment where artists can train, rehearse, and collaborate at all levels.  As part of the broader Youth Campus vision, the TransAlta Performing Arts Studios needed to support a wide range of users—from individual performers to large…