TC Energy Lab Relocation
Spruce Grove, AB
Completed 2026
hat Mattered to TC Energy
Safety and speed. TC Energy needed absolute compliance with hazardous materials handling and they needed it fast. With three different PMs cycling through on their side, continuity became just as critical as regulations. Someone had to remember everything.
hat We Built Together
We became the memory. When the client’s third PM came onboard, our record keeping meant no one started over. Every document, every decision, ready to hand over.
We navigated the design-build structure. The GC held the design team so visibility wasn’t automatic. We asked the questions anyway and made sure the client never felt locked out.
We spotted what others didn’t. The fire pump room that almost got missed. Long lead items ordered before they became delays. Site grading that would’ve caused headaches later.
We found a better home for the offices. Moving them to an existing building gave the team separation from the warehouse floor, revitalized neglected space, and freed up 6,000 square feet for extra storage. Better outcome, same budget.
The Result
Despite multiple leadership transitions, the project maintained clarity, momentum, and trust.
And an additional 6,000 square feet of storage—gained through smarter planning.
hat They Said
Their record keeping saved us countless hours, and their proactive approach caught things we never would have seen coming.
They didn’t just manage—they owned it.”
— TC Energy Project Sponsor
Let’s Talk About Your Project →