TC Energy Lab Relocation

TC Energy Lab Relocation

Spruce Grove, AB
Completed 2026

132,500 sq ft   |   $32M Budget   |   3 Client PMs   |   +6,000 sq ft Gained
A complex gas lab relocation delivered under strict safety requirements and constant leadership changes. Built for compliance, continuity, and long-term performance.

hat Mattered to TC Energy

Safety and speed. TC Energy needed absolute compliance with hazardous materials handling and they needed it fast. With three different PMs cycling through on their side, continuity became just as critical as regulations. Someone had to remember everything.

 

hat We Built Together

We became the memory. When the client’s third PM came onboard, our record keeping meant no one started over. Every document, every decision, ready to hand over.

 

We navigated the design-build structure. The GC held the design team so visibility wasn’t automatic. We asked the questions anyway and made sure the client never felt locked out.

 

We spotted what others didn’t. The fire pump room that almost got missed. Long lead items ordered before they became delays. Site grading that would’ve caused headaches later.

 

We found a better home for the offices. Moving them to an existing building gave the team separation from the warehouse floor, revitalized neglected space, and freed up 6,000 square feet for extra storage. Better outcome, same budget.

The Result

A fully compliant gas laboratory delivered safely and efficiently.

Despite multiple leadership transitions, the project maintained clarity, momentum, and trust.

And an additional 6,000 square feet of storage—gained through smarter planning.

hat They Said

“Lawson Projects was the thread that held this project together through multiple leadership changes.

Their record keeping saved us countless hours, and their proactive approach caught things we never would have seen coming.

They didn’t just manage—they owned it.”


— TC Energy Project Sponsor